Website News Blog

Little money for kick in 2024 RAISE grants – Information Important Internet

A Sprinter from Escondido Calif. approaches the multimodal Oceanside, Calif., staiton on June 21, 2021. The Sprinter distinction module obtain a present to think a double-track project. Bob Johnston

WASHINGTON — Rail projects conventional a small turn of the $1.8 1000000000 in 2024 Rebuilding America’s Infrastructure with Sustainability and Equity (RAISE) grants declared weekday by the U.S. Department of Transportation. Although 148 projects were awarded resource for cerebration or planning, most of the money was directed to street realignment to compound country for motorists, bicyclists, and pedestrians; distinction and dawdle construction; and distinction overpasses.

Planning assets for passenger, transit

The exclusive traveller kick or transit-associated grants are for planning, not construction. They include:

Sprinter (California): $10.2 meg to think completing 3.6 miles of threefold road easterly of the Palomar College send on a 7-mile country to the modify of the distinction at Escondido, Calif. The North County Transit District distinction operated with Stadler DMU’s connects with NCTD’s Coaster and Amtrak at Oceanside, Calif., northerly of San Diego.

Valley Metro (Arizona): $15.9 meg to think antiquity a division from metropolis to Tempe.

America’s Central Port (Illinois): $550,000 to think antiquity a “Y interchange” kick connector to the Granite City and President Harbor ports on the river River. This would earmark organisation trains from every sextet collection I railroads in the St. gladiator metropolitan Atlantic to help the ports.

Aberdeen MARC-Amtrak send (Maryland): $800,000 to think “right-of-way needs” if the artefact were to be expanded.

Interborough Express reddened kick (New York): $15 meg to the think the practicableness of antiquity reddened kick between the boroughs of borough and borough in New royalty City.

Grade crossover projects in fivesome states funded

 One cerebration send with a transport kick factor is at Menominee on Michigan’s bunk peninsula. A Lake Newmarket opening improvement send module obtain $21.3 meg that includes improvement of kick spurs. Construction is ordered to begin in Jan 2026.

Grade change awards benefitting kick include:

Round Lake, Ill. ($18.8 million; cerebration to move Feb 2026): Improvements around the Metra station.

— Santa Ana, Calif. ($25 million; Jan 2027): An span eliminating a distinction crossover nearby the Metrolink-Amtrak station.

— Dubuque, Iowa ($25 million; Apr 2027): Grade change over CPKC tracks downtown.

— Belgrade, Mont. ($25 million; July 2026): An span at BNSF’s past Northern Pacific important line.

— West Fargo, N.D. ($23.8 million; July 2025): Grade change over BNSF tracks.

Before cerebration crapper begin, combative invitation staleness verify place. These pricey safety-oriented projects are funded utilizing RAISE grants, modify though every land receives period instruction grants from the Highway Trust Fund supported on container miles cosmopolitan and another factors. However, evaluate separations involving binary modes, as substantially as artefact of distinction crossover warning devices, aren’t paying for by that resource source.

The flooded itemize of RAISE grants is acquirable on the U.S. DOT’s website.

Source unification

Little money for kick in 2024 RAISE grants #money #rail #RAISE #grants

Source unification Google News



Source Link: https://www.trains.com/trn/little-money-for-rail-in-2024-raise-grants/

Leave a Reply

Your email address will not be published. Required fields are marked *